MICOROSA ENVIRONMENTAL REMEDIATION PROJECT

2.jpg

Problem

Posed significant environmental challenges due to the presence of an industrial waste landfill. The critical environmental levels in this SIN area necessitated
a permanent security intervention. The project, authorized by the Italian Ministry of the Environment, aimed to address the persistent issues through capping
and physical girdling using a plastic diaphragm.

demng9of.png4.jpg
Solution

The comprehensive solution involved TP-GEO expertise and a strategic selection of materials to optimize the environmental remediation process. The application
of Geomembrane as a drainage composite for infiltration water played a pivotal role.  Placed on top of the impermeable lining, it formed an efficient underground
drainage system. This system managed surface water, directing it to drainage pumps for removal from the landfill.

The use of ensured impermeability, stability, and anti-puncture protection, respectively. contributed to environmental sustainability with its synthetic climbing
geomats, while sandy/gravel material provided effective regularization.

The collaboration with  technical team alsful conly secured the SIN area but also addressed long-standing issues associated with the presence of the industrial waste
landfill, contributing to the overall environmental safety and sustainability of the site.